Home | EKCRWA Information | Snoqualmie River Enhancement Project  | Snoqualmie Aquifer | Links    
Project History
Reports
Snoqualmie Aquifer

Snoqualmie Aquifer Reports

EKCRWA has commissioned a number of technical studies since 1993 to investigate and characterize the Snoqualmie Aquifer system. Downloadable versions of these reports are provided here for the interested reader.

The following PDF file(s) require Adobe Acrobat to view. To view directly, click on the link using the left mouse button.  To save these files locally, click on the right mouse button and choose the "Save Target As" option.
   
Report Prepared By Date Download / File Size
Streamflow Enhancement Using Groundwater: A Case Study of the Upper Snoqualmie River Basin (large file)
Golder Associates April 30, 2007
FULL REPORT 49.6 MB
Individual sections of the report:
Cover & Title 573 KB
Forward 23 KB
Exec Summary 702 KB
TOC 49 KB
Chapter 1 2.1 MB
Chapter 2 1.5 MB
Chapter 3 4.0 MB
Chapter 4 4.0 MB
Chapter 5 33 KB
Chapter 6 663 KB
Chapter 7 59 KB
Cover 568 KB
Appendix_A 496 KB
Appendix_B 4.8 MB
Appendix_C 7.5 MB
Appendix_D 10.4 MB
Appendix_E 34 KB
Appendix_F 11.7 MB
Appendix_G 785 KB
Appendix_H 577 KB
Appendix_I 143 KB
Appendix_J 497 KB
Appendix_K 727 KB

Snoqualmie Basin Groundwater Supply Evaluation Geophysical Survey

 

 

Golder Associates January 9, 1995

Report

184 KB

Figure 1-1

1667 KB
Figure 2-1 489 KB
Figure 2-2 1352 KB
Figure 2-3 753 KB
Figure 2-4 325 KB
Figure 2-5 469 KB
Figure 3-1 2403 KB
Figure 3-2 613 KB
Figure 3-3 490 KB
Figure 3-4 495 KB
Figure 3-5 2173 KB
Figure 3-6 408 KB
Figure 3-7 419 KB
Figure 3-8 669 KB
Figure 3-9 2113 KB

Technical Briefing Document on Hydrogeologic Investigations in the Upper Snoqualmie Basin
Golder Associates January 17, 1996
Report 37 KB
Figure 1 1495 KB
Figure 2 356 KB
Figure 3 545 KB
Figure 4 349 KB
Figure 5 288 KB
Figure 6 300 KB
Figure 7 291 KB
Figure 8 328 KB
Figure 9 349 KB
Figure 10 297 KB
Figure 11 316 KB
Figure 12 382 KB
Figure 13 376 KB
Figure 14 294 KB
Figure 15 272 KB

Project Description and Work Plan for Snoqualmie Aquifer Project Permit Application G1-27384 and S1-22877

 

Golder Associates March 30, 1998
Report 99 KB
Figure 1-1 547 KB
Figure 2-1 3026 KB
Figure 2-2 656 KB
Figure 2-3 643 KB
Figure 2-4 216 KB
Figure 3-1 1700 KB
Figure 3-2 3666 KB
Figure 3-3 792 KB
Figure 3-4 364 KB

Preliminary Watershed Assessment for the Snoqualmie Aquifer Project
Golder Associates October 30, 2000
Report 123 KB
Figure 1-1 578 KB
Figure 1-2 748 KB
Figure 1-3 617 KB
Figure 1-4 514 KB
Figure 1-5 314 KB
Figure 2-1 214 KB
Figure 2-2 648 KB
Figure 3-1 403 KB
Figure 4-1 221 KB
Figure 5-1 358 KB

Drilling and Testing of Middle Fork Test Well and Recommendations for Additional Groundwater Investigations
Golder Associates May 15, 2001
Report 35 KB
Figure 1-1 1064 KB
Figure 2-1 969 KB
Draft Preliminary Permit for Mitigation Well
Golder Associates August 8, 2005
Letter 175 KB
River Augmentation – Snoqualmie Aquifer Project
Golder Associates August 8, 2005
Report 388 KB